5MW Renewable Energy Project for grid, Gansu Province, China

CDM-0594 ↗

#208of 770 in Renewable energy#72of 204 in China#44of 213 in CDM (UNFCCC)#63of 417 in AMS-I.D

5.6/ 10
Integrity
7.5
Transparency
3.5
Claim Safety
6.5
Documentation
3.0

Audit Analysis

A 5 MW grid-connected hydro project in Gansu, China, validated under CDM with a standard jurisdictional grid baseline and a VVB-confirmed investment additionality test. The core design is sound and leakage treatment is reasonable for a grid-connected renewable, but the available record contains no monitoring or verification reports, no verified emission reduction figures, and low extraction confidence, leaving the project's actual performance unconfirmed.

Red Flags

  • No monitoring reports or verification reports found in the extracted record; total verified ERR is not stated, so actual delivery cannot be assessed against the 115,661 tCO₂e lifetime claim.
  • Minimum extraction confidence is rated low, and one of the four source documents is listed as 'unknown', reducing reliability of the extracted data.
  • No FPIC or grievance mechanism is documented despite safeguards being mentioned, leaving community engagement unverified.

Credit Vintages

IssuedRetiredAvailable
2009
11,800011,800
2010
12,257012,257
2012
21,494021,494
2014
34,902034,902
Total80,453080,453

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Hydro – no inherent reversal risk

Leakage

0 % – deemed negligible, justified

Baseline

Jurisdictional grid EF, current at validation

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents