5MW Renewable Energy Project for grid, Gansu Province, China
#208of 770 in Renewable energy#72of 204 in China#44of 213 in CDM (UNFCCC)#63of 417 in AMS-I.D
Audit Analysis
A 5 MW grid-connected hydro project in Gansu, China, validated under CDM with a standard jurisdictional grid baseline and a VVB-confirmed investment additionality test. The core design is sound and leakage treatment is reasonable for a grid-connected renewable, but the available record contains no monitoring or verification reports, no verified emission reduction figures, and low extraction confidence, leaving the project's actual performance unconfirmed.
Red Flags
- No monitoring reports or verification reports found in the extracted record; total verified ERR is not stated, so actual delivery cannot be assessed against the 115,661 tCO₂e lifetime claim.
- Minimum extraction confidence is rated low, and one of the four source documents is listed as 'unknown', reducing reliability of the extracted data.
- No FPIC or grievance mechanism is documented despite safeguards being mentioned, leaving community engagement unverified.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 11,800 | 0 | 11,800 | |
| 2010 | 12,257 | 0 | 12,257 | |
| 2012 | 21,494 | 0 | 21,494 | |
| 2014 | 34,902 | 0 | 34,902 | |
| Total | 80,453 | 0 | 80,453 |
Risk Indicators
VVB-confirmed investment test
Hydro – no inherent reversal risk
0 % – deemed negligible, justified
Jurisdictional grid EF, current at validation
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →