6.5MW WHR Project in Huasheng Tianya Cement Co., Ltd.
#59of 204 in China#31of 213 in CDM (UNFCCC)#3of 17 in ACM0004
Audit Analysis
A 6.5 MW waste-heat-recovery project at a Chinese cement plant with VVB-confirmed additionality and smart-meter monitoring, but undermined by contradictory baseline-method descriptions across documents, an inconsistent leakage justification, and a grid emission factor drawn from 2004 data. The project is a standard CDM energy-efficiency credit with moderate data reliability concerns.
Red Flags
- Baseline method is described as 'project' in the 2011 monitoring report but 'jurisdictional' in the PDD — the two characterisations are not reconciled in any available document.
- Leakage justification is stated as 'not addressed' in the 2011 monitoring report yet 'deemed negligible' in the 2010 report, leaving the 0 % deduction without a consistent, documented rationale.
- Grid emission factor of 0.8145 tCO₂/MWh is drawn from 2004 data; no updated or reassessed factor is found in the extracted record.
- Total verified ERR figure is absent from the extracted record, preventing an independent cross-check of the 29,235 tCO₂e claimed for the 2010–2011 monitoring period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 15,645 | 0 | 15,645 | |
| 2009 | 59,556 | 0 | 59,556 | |
| 2011 | 28,330 | 0 | 28,330 | |
| Total | 103,531 | 0 | 103,531 |
Risk Indicators
VVB-confirmed barrier test
EE project – no reversal risk
0% deduction, inconsistent justification
Method contradictory; 2004 grid EF
Mentioned but FPIC/grievance not detailed
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →