7.5 MW biomass based Power Project by SCPL, India
#161of 196 in Biomass#6of 8 in Rajasthan India#280of 421 in Universal Carbon Registry (UCR)#347of 417 in AMS-I.D
Audit Analysis
This 7.5 MW biomass power project in Rajasthan, India uses a jurisdictional baseline with a 2021 grid emission factor of 0.9 tCO₂/MWh, which is methodologically sound. However, the evidence file contains only a single PDD with no verification report, no VVB assessment, no additionality test documentation, and no monitoring data, leaving critical integrity and transparency questions unanswered.
Red Flags
- No additionality test type or VVB verification of additionality found in any available document
- No verification report, monitoring report, or VVB report present in the evidence file — only a PDD
- No buffer pool or permanence mechanism stated for the project
- No FPIC or grievance mechanism documented despite safeguards being mentioned
- Crediting period is only one year (2021) with the PDD dated after the period ended (March 2022)
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB verification found
No buffer pool stated; low inherent reversal risk for biomas
0% deduction, 'deemed negligible' without quantified analysi
Jurisdictional baseline stated; no reassessment date found
Safeguards mentioned; no FPIC or grievance mechanism documen
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →