This 7 MW CDM hydro project in Himachal Pradesh has a VVB-confirmed investment additionality test and a jurisdictional grid baseline, but is severely undermined by 23 material findings, 23 corrective actions, a 3.5× discrepancy between the PDD's lifetime ERR claim (19,693 tCO₂) and the monitoring report's figure (69,044 tCO₂), and an uncertain 2 MW component whose implementation was questioned during validation. The project's integrity and documentation quality are significantly below acceptable thresholds.
Red Flags
- The monitoring report reports 69,044 tCO₂ for the 2018–2020 period while the PDD claims only 19,693 tCO₂ over the full 10-year crediting period — a 3.5× discrepancy that cannot be reconciled without further evidence
- The 2 MW Gehra sub-project's implementation was found to be uncertain during validation interviews, yet it is included in the CDM project boundary
- The methodology version referenced in the PDD was flagged as no longer valid at the time of review
- The investment analysis underlying the additionality claim lacks a traceable IRR spreadsheet, a justified benchmark, and uses an incorrect tariff (2.5 vs. actual 2.95 INR/kWh)
- 23 material findings and 23 corrective actions were raised, indicating systemic deficiencies in the PDD and validation process
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 64,508 | 0 | 64,508 | |
| 2022 | 49,024 | 0 | 49,024 | |
| Total | 113,532 | 0 | 113,532 |
Risk Indicators
VVB-confirmed but analysis severely deficient
Avoidance project, no reversal events
0% deemed negligible, appropriate for hydro
Jurisdictional but grid EF from 2009, doc contradiction
Mentioned and benefit sharing described, FPIC/grievance not
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →