Rated
8MW Cirompang Mini Hydro Power Plants at Bungbulang, Garut, Indonesia.
- Standard
- CDM
- Methodology
- AMS-I.D (CDM)
- Registry
- CDM-7553 ↗ · Registered
- Country
- Indonesia
- Credit type
- Hydro
- Developer
- PT. Tirta Gemah Ripah
CarbonMeld's document-based rating gives 8MW Cirompang Mini Hydro Power Plants at Bungbulang, Garut, Indonesia. (CDM-7553) 3.1 out of 10 (Very low rating) under CarbonMeld methodology v3, documents read on 29 Oct 2026. The analysis read 10 of the 12 registry documents. It is CarbonMeld's own assessment, not a rating given by the registry or the standard.
Assessment
Evidence
Eligibility & market
Under decision 4/CMP.20 of the Parties to the Kyoto Protocol (FCCC/KP/CMP/2025/7/Add.1, paragraph 5), the submission of requests for issuance of new CERs was discontinued as of 30 June 2026; requests to transfer CERs to the Article 6.4 mechanism registry, cancellations and any other transactions in the CDM registry are discontinued as of 31 December 2026. This page keeps the project's record and our analysis.
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Issuances
| Issued | Retired | Available | ||
|---|---|---|---|---|
| Issued in 2018 | 16,411 | 0 | 16,411 | |
| monitoring period 1 Mar 2013 – 28 Feb 2017 | ||||
| Issued in 2019 | 37,741 | 0 | 37,741 | |
| monitoring periods 1 Mar 2017 – 28 Feb 2019 | ||||
| Issued in 2020 | 10,772 | 0 | 10,772 | |
| monitoring period 1 Mar 2019 – 29 Feb 2020 | ||||
| Total | 64,924 | 0 | 64,924 | |
The registry publishes each issuance with its monitoring period. Each row here is the sum of one year's issuances, by the year they were issued — not a vintage (the year the reductions or removals took place). Under each year: the monitoring periods of the credits issued in it.
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2013–2017AMS-I.D v17.0since replaced by v18.0
monitoring report
official page · verified on
2017–2018AMS-I.D v17.0since replaced by v18.0
monitoring report
official page · verified on
2018–2019AMS-I.D v17.0since replaced by v18.0
monitoring report
official page · verified on
2019–2020AMS-I.D v17.0since replaced by v18.0
monitoring report
official page · verified on
- AMS-I.D: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Cite this page
CarbonMeld (2026). 8MW Cirompang Mini Hydro Power Plants at Bungbulang, Garut, Indonesia. (CDM-7553): CarbonMeld document-based rating, methodology v3, documents read on 29 Oct 2026. https://carbonmeld.com/projects/8mw-cirompang-mini-hydro-power-plants-at-bungbulang-garut-indonesia/.
The citation names the rating by its methodology version and the day the documents were read.
Similar projects
Same methodology or sector, the same registry first.
- Bundled Estelar CDM ProjectCDM-2994
- Bundled Wind Power Project in Maharashtra & Gujarat by WPPLCDM-4382
- Wind Power Project by Astra Lifecare (India) Private Limited at Gujarat, IndiaCDM-8715
- Sigrun group bundled wind power Version 01 September 09, 2007 projectCDM-3863
- Chimbera 1, 2 and 3 Solar Photovoltaic Power Plant ProjectCDM-9338
- Bundled Wind Power Project- Parikh Gp (EKI CDM.Sept-10-01)CDM-8186
- 3MWp Grid Connected Solar Power Project at Yalesandra Village, Kolar District, Karnataka, IndiaCDM-5560
- Grid Connected Wind Power Project by M/s. Giriraj Enterprises at Tejuva, RajasthanCDM-5845
