Re-assessment pending
9 MW Wind Power Project in Tamil Nadu by ACC Limited
- Standard
- CDM
- Methodology
- AMS-I.D (CDM)
- Registry
- CDM-2679 ↗ · Registered
- Country
- India
- Credit type
- Wind
- Developer
- ACC Limited
9 MW Wind Power Project in Tamil Nadu by ACC Limited (CDM-2679) is being re-assessed under the current CarbonMeld methodology (v3): its earlier rating came from an older version of the method and is no longer shown, so this page gives no CarbonMeld rating until the new analysis is published.
Assessment
Being reassessed under the current method
The earlier analysis of this project used an older version of our method, so its rating is no longer shown: it is not comparable with ratings under the current method (v3). The new analysis will appear here once it is published; until then, this page shows the project's registry data.
Standard and methodology
Evidence
Eligibility & market
Under decision 4/CMP.20 of the Parties to the Kyoto Protocol (FCCC/KP/CMP/2025/7/Add.1, paragraph 5), the submission of requests for issuance of new CERs was discontinued as of 30 June 2026; requests to transfer CERs to the Article 6.4 mechanism registry, cancellations and any other transactions in the CDM registry are discontinued as of 31 December 2026. This page keeps the project's record.
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Issuances
| Issued | Retired | Available | ||
|---|---|---|---|---|
| Issued in 2011 | 21,181 | 0 | 21,181 | |
| monitoring period 3 Sep 2009 – 15 Sep 2010 | ||||
| Issued in 2012 | 18,111 | 0 | 18,111 | |
| monitoring period 16 Sep 2010 – 15 Sep 2011 | ||||
| Issued in 2013 | 21,745 | 0 | 21,745 | |
| monitoring period 16 Sep 2011 – 10 Sep 2012 | ||||
| Total | 61,037 | 0 | 61,037 | |
The registry publishes each issuance with its monitoring period. Each row here is the sum of one year's issuances, by the year they were issued — not a vintage (the year the reductions or removals took place). Under each year: the monitoring periods of the credits issued in it.
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2009–2010AMS-I.D v13.0since replaced by v18.0
monitoring report
official page · verified on
2010–2011AMS-I.D v13.0since replaced by v18.0
monitoring report
official page · verified on
2011–2012AMS-I.D v13.0since replaced by v18.0
monitoring report
official page · verified on
- AMS-I.D: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Report an error on this page
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Report an error on this page →Cite this page
CarbonMeld (2026). 9 MW Wind Power Project in Tamil Nadu by ACC Limited (CDM-2679): registry data. https://carbonmeld.com/projects/9-mw-wind-power-project-in-tamil-nadu-by-acc-limited-cdm-2679/.
The citation names the registry data this page shows; the page gives no CarbonMeld rating.
Records with the same name in other registries
Records in another registry with the same name, country and methodology. Each has its own credits, documents and rating.
- 9 MW Wind Power Project in Tamil Nadu by ACC LimitedVerra · VCS-481
Similar projects
Same methodology or sector, the same registry first.
- The Korea Hydro & Nuclear Power Co. Renewable Energy Project (3MW Yonggwang Photovoltaic Power + 0.75MW Kori Wind Power, Bundling Project)CDM-2282
- Sigrun group bundled wind power Version 01 September 09, 2007 projectCDM-3863
- Gudauri Small Hydropower ProjectCDM-9079
- Grid connected 3MWp Solar PV power plant in Belgum District of Karnataka State, IndiaCDM-5906
- Nam Xa Hydropower ProjectCDM-7509
- 3 MW grid connected wind power project by M/s Geetarani MohantyCDM-9476
- Luogu 10MW Hydropower Station Project in Sichuan ProvinceCDM-4287
- Small Hydropower Projects at Alupola and Badulu Oya.CDM-0100
