The Akbuk Wind Power Plant is a Gold Standard wind project with a solid combined additionality test confirmed by the VVB and a strong over-delivery record (verified ERR is roughly 6.4× the pro-rata expectation for the elapsed monitoring period). However, the project carries material compliance concerns: three corrective action requests and seven corrective requests in the verification report, FPIC not conducted per the most recent PDD, no buffer pool or permanence mechanism stated, and nine contradictions across the document set that undermine data reliability.

Red Flags

  • Three corrective action requests (CAR 1–3) and seven corrective requests (CR 1–7) were raised in the verification report, indicating material compliance gaps that must be resolved before credits are issued.
  • FPIC was not conducted according to the 2023 PDD, despite an earlier 2017 PDD claiming it was done — a direct contradiction that raises free, prior, and informed consent concerns for affected communities.
  • No buffer pool percentage or permanence mechanism is stated in any available document, and reversal events are listed as 'not addressed,' leaving the permanence safeguard undocumented even though wind carries inherently low reversal risk.
  • Nine contradictions were identified across the project's documents (FPIC, additionality test type, baseline method, grievance mechanism, leakage justification, grid emission factor, crediting period, benefit sharing, and total ERR), signalling inconsistent record-keeping and reduced data reliability.

Credit Vintages

IssuedRetiredAvailable
2015
2,8952,8950
2016
18,49018,4900
2017
16,55516,5550
2018
16,84616,8460
2019
32,74132,549192
2020
34,31534,3150
2021
40,50415,69024,814
2022
41,254041,254
2023
37,654037,654
2024
16,308016,308
Total257,562137,340120,222

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

No buffer pool stated; reversal not addressed

Leakage

0% deemed negligible, reasonable for wind

Baseline

Project-specific, not jurisdictional

Safeguards

Grievance present; FPIC not conducted (2023 PDD)

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents