ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project
#136of 770 in Renewable energy#8of 104 in Brazil#24of 213 in CDM (UNFCCC)#96of 383 in ACM0002
Audit Analysis
A CDM small-hydro avoidance project in Brazil with VVB-confirmed additionality and a low inherent reversal risk, but the record is marred by a significant discrepancy in verified emission-reduction figures across documents, a baseline-method contradiction, and two outstanding corrective actions. The project is broadly sound for its type, yet data-reliability issues prevent a higher confidence rating.
Red Flags
- Verified ERR figure of 695,355 tCO₂e in the merged record exceeds the PDD ex-ante estimate of 673,897 tCO₂e for the full 7-year crediting period, while the monitoring report (2022) reports only 361,252 tCO₂e for the 2016–2020 period — a three-way inconsistency that undermines confidence in the credit quantity.
- Two corrective actions remain open: the project proponent has not yet provided the history of installed-capacity changes or an explanation for the Ombreiras emissions-calculation discrepancy between the 2nd and 3rd monitoring periods.
- Baseline method is described as 'project-specific' in one monitoring report and 'jurisdictional' in another, creating ambiguity about the exact baseline construction.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 432,630 | 0 | 432,630 | |
| 2008 | 140,333 | 0 | 140,333 | |
| 2010 | 167,151 | 0 | 167,151 | |
| 2012 | 110,786 | 0 | 110,786 | |
| 2014 | 298,435 | 0 | 298,435 | |
| 2023 | 611,604 | 0 | 611,604 | |
| Total | 1,760,939 | 0 | 1,760,939 |
Risk Indicators
VVB-confirmed barrier test
Avoidance project, no reversal risk
0% deemed negligible, justified
Project-specific, method contradiction
Mentioned but details not documented
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →