Skip to main content
ScoredBCRWaste handling and disposalTurquíaRegistry: Under validationACM0001

AREL MILAS LFG & BIOMETHANISATION PLANT PROJECT

Developer: Arel Çevre Yatırımları Enerji ve Elektrik Üretimi A.Ş

BCR-TR-195-13-001 ↗

Under validation

An independent validator is checking the project design, or the registry is reviewing a registration request. The project, or its new phase, is not registered yet.

Any offer to sell its credits is a forward commitment on possible future issuance, not an existing carbon credit. Verify on the registry before paying.

BioCarbon Registry: “Request for Registration Under Review”

Assessment

CarbonMeld document-based assessment

01020304 Overall 5.0 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Analysis

The Arel Milas LFG & Biomethanisation project presents a standard waste-to-energy design with an investment additionality test and a project-specific modeled baseline, but suffers from a notable discrepancy between its claimed emissions reductions (270,003 tCO₂e) and the monitoring report's revised ex-ante lifetime estimate (217,440 tCO₂e), raising over-crediting concerns. Additionality was not independently confirmed by the VVB, the leakage deduction is 0% on a thin 'deemed negligible' basis, and several key MRV parameters (fnrb method, usage monitoring, verified ERR) are absent from the extracted record. The project remains in 'Request for Registration Under Review' status, so no credits have yet been issued.

Red Flags

3 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

Per-dimension scores, risk indicators, 3 red flags, score factors, detailed analysis, and 8 registry documents (8 analyzed).

€9+ VAT · 30-day pass · one-time, no auto-renewal

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons for 30 days (public-data comparison is free; fair use: 30 projects per day).

Price + VAT · By paying you accept the Terms of Use — digital content, no refunds. How Premium works

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: methodology

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

Issuance data not yet available — check back soon.

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →