Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalChina Registry: RegisteredACM0001

Gaizhou Landfill Gas Power Generation Project

VCS-2468 ↗

#8of 64 in Methane#38of 204 in China#128of 629 in Verra (VCS)#9of 53 in ACM0001

6.2/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.5
Documentation
5.5

Audit Analysis

A VCS landfill gas power generation project in China with confirmed additionality (combined test, VVB-verified) and no reported reversal events, but hampered by a project-specific baseline, an internally inconsistent leakage justification, and two material findings requiring corrective action. The project delivered roughly 71% of its pro-rata expected emissions reductions for the elapsed monitoring period, indicating conservative rather than inflated claims. Documentation is reasonably comprehensive (23 documents) but carries medium extraction confidence and unresolved internal contradictions.

Red Flags

  • Internal contradiction within the verification report: one section justifies 0% leakage as 'deemed negligible' while another section indicates leakage was 'not addressed' — the justification is inconsistent within the same document.
  • Two material findings in the verification report: Section 2.4 failed to describe site-visit inspection details, and the basis for net electricity values used in ER calculations was unclear, both requiring corrective action.
  • FPIC status is contradictory: the verification report (Sep 2024) confirms FPIC was conducted, while the monitoring report (Aug 2024) states it was not — a significant safeguards discrepancy.
  • Buffer pool percentage is not stated in any available document, leaving the permanence risk mitigation framework unclear.

Credit Vintages

IssuedRetiredAvailable
2021
102,460102,4600
2022
93,49173,49120,000
2023
46,95141,0765,875
2024
5,87505,875
Total248,777217,02731,750

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversals, buffer pool not stated

Leakage

0% deduction, inconsistent justification

Baseline

Project-specific, reassessment timing not stated

Safeguards

FPIC contradictory, grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents