Ankang Hanbin Landfill Gas Power Generation Project
#4of 64 in Methane#27of 204 in China#81of 629 in Verra (VCS)#6of 53 in ACM0001
Audit Analysis
A VCS landfill gas power generation project in China with a confirmed investment-test additionality assessment and no reversal risk inherent to the project type. The project is over-delivering relative to its pro-rata ex-ante expectation (approximately 146% of the expected credits for the elapsed monitoring period), which is a positive signal. However, several transparency gaps remain — FNRB method, usage monitoring, and CORSIA eligibility are not stated — and four contradictions between the PDD and verification report require attention.
Red Flags
- Four contradictions between the PDD and the verification report (baseline type, additionality test type, lifetime ERR, benefit-sharing description) reduce confidence in data consistency across documents
- FNRB method and usage monitoring method are not stated in any available document, leaving the electricity-displacement calculation partially unverifiable
- Buffer pool percentage is not stated in the extracted record, creating a gap in permanence assurance despite the low inherent reversal risk of landfill gas
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
On-site combustion, no storage, no reversal risk
0% deemed negligible, reasonable for on-site gas use
Project-specific modeled baseline, not yet due for reassessm
FPIC, grievance mechanism, benefit sharing all documented
CCP eligible; CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →