Argibem, São Sebastião and Vulcão Ceramics Fuel Switching Project
Score Breakdown
Integrity
verified Additionality was confirmed by TÜV Rheinland do Brasil Ltda, and the project uses a barrier test rather than relying on an unstated assumption.
missing The monitoring report lists many corrective actions, and the record shows no buffer pool percentage or reversal-event detail, leaving permanence management only partially evidenced.
Transparency
verified The project has a named VVB and a defined monitoring period from 2011-07-01 to 2013-02-28, with verified and claimed reductions matching at 31,521 tCO2e in the monitoring report.
missing Usage monitoring is not stated, and the record contains multiple document inconsistencies that reduce confidence in the completeness of the public MRV trail.
Claim Safety
verified The verified emissions reduction figure matches the claimed figure in the monitoring report, which supports internal consistency for that reporting cycle.
missing The project is not CORSIA-eligible, but CCP status is not stated and the validation/monitoring records conflict on leakage treatment and reduction totals, increasing over-crediting risk.
Documentation
verified The record draws on multiple official documents, including monitoring, validation, and issuance materials, and extraction confidence is high.
missing Several key fields are not stated in available documents, including buffer pool, usage monitoring method, and baseline reassessment timing, and the monitoring report contains numerous CARs.
Detailed Analysis
Integrity
The project’s additionality is stronger than average because the monitoring report says a barrier test was used and that additionality was confirmed by the VVB, TÜV Rheinland do Brasil Ltda. However, permanence is only partly supported because no buffer pool percentage is stated and no reversal-event detail is found in the extracted record. The monitoring report also lists many corrective actions, which suggests implementation and control weaknesses even though no material findings were reported.
Transparency
The monitoring period is clearly stated and the VVB is named, which helps traceability. Still, usage monitoring is not stated in available documents, and the record does not provide a clear public MRV trail for how end-use or usage was tracked. The extracted record also shows multiple corrective actions, indicating that the reporting package needed substantial cleanup.
Claim Safety
Claim safety is weakened by the contradiction between the monitoring report and validation report on emissions reductions and leakage treatment. I privileged the monitoring report for the 31,521 tCO2e figure because it is the later reporting document and matches the verified amount in the same cycle, but the earlier validation record reportedly used 41,597 and described leakage as deemed negligible, while the monitoring report says leakage was quantified. The project is not CORSIA-eligible, which helps, but CCP status is not stated and the conflicting records raise over-crediting risk.
Documentation
Documentation is moderate rather than strong: there are multiple official documents in the record and extraction confidence is high, but several core items are missing or not stated, including buffer pool coverage, usage monitoring method, and baseline reassessment timing. The monitoring report also contains a long list of CARs, including corrections to project naming, tables, and monitoring sections, which suggests the documentation package was not fully polished. Because the record is incomplete on several key quality indicators, documentation cannot score higher.
Overall
The main contradictions are the emissions reduction totals, the leakage characterization, the additionality test type, and whether safeguards were documented. I privileged the later monitoring report for the 31,521 tCO2e figure and the barrier-test framing because it is the more recent project-specific reporting document, but I discounted confidence because the validation report appears to have used different values and a different leakage interpretation. The project is therefore usable but not high confidence: the evidence supports issuance, yet the reliability of the surrounding documentation and safeguard narrative is uneven.
Audit Analysis
This project has some positive signs, including VVB-confirmed additionality and no reported reversal events, but the evidence base is weakened by major documentation inconsistencies and limited public-facing MRV detail. The monitoring report also shows numerous corrective actions and weak social/safeguard documentation, which raises reliability and claim-safety concerns.
Project Description
Proponent: Multiple Proponents Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.C. Estimated annual GHG reductions: 20814 tCO2e Region: Latin America Registration date: 2012-06-18
Red Flags
- The monitoring and validation records disagree on key figures and leakage treatment, including different emissions reduction totals and different leakage characterizations.
- Safeguards are poorly documented: no FPIC, no grievance mechanism, and no clear benefit-sharing description were found in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 12,787 | 12,787 | 0 | |
| 2007 | 17,380 | 17,380 | 0 | |
| 2008 | 17,217 | 17,217 | 0 | |
| 2009 | 16,235 | 16,235 | 0 | |
| 2011 | 6,909 | 3,656 | 3,253 | |
| 2012 | 9,309 | 0 | 9,309 | |
| 2013 | 1,458 | 0 | 1,458 | |
| Total | 81,295 | 67,275 | 14,020 |
Cosa migliorerebbe questo punteggio
- Publish a reconciled emissions and leakage memo that explains why the monitoring report and validation report differ, and clearly states which figures govern issuance.
- Add complete MRV and safeguard documentation, including usage monitoring procedures, buffer pool or reversal provisions, grievance handling, and any benefit-sharing or FPIC evidence.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed barrier test, but contradictory prior record
No reversal events reported, but buffer pool not stated
Leakage addressed, but treatment conflicts across documents
Project baseline stated, but reassessment timing missing
No FPIC or grievance mechanism documented
Not CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →