VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalOman Registry: RegisteredACM0001

Barka Landfill Gas Recovery Project

VCS-4550 ↗

#34of 64 in Methane#453of 629 in Verra (VCS)#32of 53 in ACM0001

4.8/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.5

Audit Analysis

The Barka Landfill Gas Recovery Project has a VVB-confirmed additionality assessment and a measured project-specific baseline, but the verification report flags four material findings including prolonged flare shutdown and absence of the gas generator, indicating that actual emission reductions were substantially below ex-ante expectations. Multiple contradictions across the PDD, monitoring report, and verification reports — particularly on FPIC, grievance mechanism, benefit sharing, and the ERR figure — undermine confidence in the data record. The absence of a stated buffer pool, unaddressed reversal risk, and missing FNRB/usage-rate data leave meaningful gaps in the permanence and claim-safety picture.

Red Flags

  • Verification report material finding: flare device shut off intermittently (Mar–Oct 2024) and completely (May–Jun 2024), and gas generator never installed, meaning zero electricity generation during the monitoring period
  • Verification report states actual emission reductions were substantially lower than ex-ante estimates due to limited cell closure and lack of generator
  • ERR discrepancy: PDD (Jul 2024) reports 28,670 tCO₂e while the monitoring report (Oct 2025) and later verification report (Dec 2025) report 62,349 tCO₂e — the basis for the difference is not explained in the extracted record
  • No buffer pool percentage stated and reversal events explicitly not addressed in the verification report
  • Three corrective action requests (CARs) issued by the VVB, including incomplete stakeholder engagement documentation and missing equipment specifications

Credit Vintages

IssuedRetiredAvailable
2022
28,670028,670
2023
33,459033,459
2024
28,890028,890
Total91,019091,019

Risk Indicators

Additionality

Combined test confirmed by VVB

Permanence

No buffer pool stated; reversal not addressed

Leakage

0 % deduction, deemed negligible, not quantified

Baseline

Project-specific, measured; reassessment not yet due

Safeguards

FPIC and grievance confirmed but contradicted across docs

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents