The Basak Hydropower Plant is a VCS-registered renewable energy avoidance project with a confirmed investment additionality test and a jurisdictional grid-emission-factor baseline. The project delivered roughly 50% of its pro-rata expected reductions for the monitored period, which is conservative but raises questions about the accuracy of the ex-ante estimate. Multiple contradictions across documents and a low extraction confidence level temper confidence in the overall data picture.
Red Flags
- Verified ERR of 21,164 tCO2 (Sept 2024 verification report) is only ~50% of the pro-rata expectation of ~42,476 tCO2 for the 4-year monitoring period, and a separate verification report (July 2024) reports 38,021 tCO2 — an unexplained discrepancy of ~17,000 tCO2 between two reports issued weeks apart.
- Ten contradictions were identified across the document set, including conflicting additionality test types (investment vs. regulatory), conflicting baseline methods (jurisdictional vs. project-specific), and conflicting FPIC and grievance-mechanism statuses between the PDD and the verification report.
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in the completeness of the extracted record.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project – no reversal risk
0% – negligible for fixed hydropower
Jurisdictional grid EF; method contradicted in PDD
FPIC and grievance confirmed in 2024 report but contradicted
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →