Skip to main content
GSBiomass, or Liquid Biofuel - HeatIndiaAMS-I.C

Biomass based Steam Generation plant at Chanakya Dairy Products Limited

GS-727 ↗ · current registry ID: GS4195

#81of 196 in Biomass#319of 387 in India#349of 426 in Gold Standard (GS)#24of 42 in AMS-I.C

4.5/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A Gold Standard biomass steam-generation project (AMS I.C) with a VVB-confirmed investment additionality test and conservative emissions delivery (84% of pro-rata expectation), but undermined by seven unresolved corrective actions, contradictory permanence and crediting-period data across documents, a 0% leakage deduction with minimal justification, and low extraction confidence in the underlying record. The project is functional but carries meaningful data-reliability and documentation gaps that limit confidence in its integrity and transparency.

Red Flags

  • Seven corrective actions (CL 01–03, CAR 01–04) remain open in the verification report, including inconsistent calibration dates, missing SD parameters, and unclear Gold Standard transition compliance
  • No buffer pool percentage is stated in any available document, and the verification report marks reversal events as 'not addressed' while the later monitoring report reports none — an unresolved contradiction
  • Crediting period end date is missing in the verification report (2016-02-23 to null) but stated as 2025-11-01 in the PDD, creating uncertainty about the project's remaining validity
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of the entire evidence base

Credit Vintages

IssuedRetiredAvailable
2016
19,30919,3090
2017
22,39122,3910
2018
22,45016,6935,757
2019
22,78795021,837
2020
23,05310,38112,672
2021
22,8563,60919,247
Total132,84673,33359,513

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer pool; reversal data contradictory

Leakage

0% deduction, thin justification

Baseline

Project-specific, no reassessment date

Safeguards

FPIC, grievance mechanism, SD documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS I.C

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents