Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Brazil Registry: RegisteredAMS-I.E

Bom Jesus Ceramic Fuel Switching Project

VCS-202 ↗

#46of 202 in Industrial#21of 104 in Brazil#270of 629 in Verra (VCS)#9of 26 in AMS-I.E

5.5/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
5.0

Audit Analysis

The Bom Jesus Ceramic Fuel Switching Project is a VCS-registered fuel-switching project in Brazil with VVB-confirmed additionality and no material findings, but it carries notable data-quality concerns reflected in 14+ corrective actions across monitoring reports. The project-specific baseline, absence of a stated buffer pool, and unaddressed reversal risk temper its integrity profile, while self-reported usage monitoring and a medium extraction confidence limit transparency. Overall, the project is functional but sits in the mid-range of credit quality.

Red Flags

  • 14+ corrective actions in the 2024 verification report reveal systematic data-quality errors in monitoring reports, including incorrect parameter values, wrong units, missing evidence for biomass receipts, and use of glycerin not listed in the PDD
  • Buffer pool percentage is not stated in any available document, leaving permanence risk unquantified
  • Reversal events are explicitly marked as 'not addressed' in the extracted record
  • Usage monitoring relies on self-reporting rather than independent metering or third-party verification
  • Multiple contradictions across verification reports (2012, 2018, 2024) on FPIC, grievance mechanism, safeguards, and additionality test type indicate inconsistent documentation over time

Credit Vintages

IssuedRetiredAvailable
2007
12,67712,61364
2008
12,44612,4460
2009
12,27512,2750
2010
13,90613,9060
2011
14,02514,0250
2012
15,3414,92710,414
2013
20,9958,87812,117
2014
12,6118,0324,579
2015
9,9294,9584,971
2016
8,6284,3094,319
2017
7,76607,766
2018
8,25608,256
2019
6,80406,804
2020
6,24906,249
2021
5,12305,123
Total167,03196,36970,662

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

Buffer pool not stated; reversal unaddressed

Leakage

0% deduction, justified but thin

Baseline

Project-specific; reassessed 2018

Safeguards

FPIC and grievance per 2018; inconsistent with 2012

Double-claim

CORSIA excluded; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-I.E

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents