Cassava Waste To Energy Project, Kalasin, Thailand (CWTE project)
#3of 48 in Thailand#123of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM methane-avoidance project (cassava waste biogas) with VVB-confirmed additionality and a measured project-specific baseline. The project delivered roughly 179% of its pro-rata emission-reduction expectation for the monitored period, indicating no over-crediting risk. Key gaps include the absence of a verified ERR figure, unquantified leakage treatment, and missing safeguards documentation (FPIC, grievance mechanism).
Red Flags
- Verified ERR figure is not found in the extracted record; only the claimed 39,606 tCO2e for a ~4-month monitoring period is available, making independent cross-check impossible
- Leakage deduction is 0% with a 'deemed negligible' justification rather than a quantified assessment, and the 2010 monitoring report described leakage as 'quantified' — the basis shifted between reports
- FPIC and grievance mechanism are not documented in the available records, leaving community safeguards unverified
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 75,446 | 0 | 75,446 | |
| 2013 | 14,610 | 0 | 14,610 | |
| Total | 90,056 | 0 | 90,056 |
Risk Indicators
VVB-confirmed barrier test
Avoidance project, no reversals
0% deduction, deemed negligible
Project-specific, measured, 2010
Mentioned but FPIC/grievance unverified
CORSIA and CCP status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →