Skip to main content
UCRDelhi NCR IndiaAMS-III.C

Chargeup Solution

UCR-585 ↗

#55of 421 in Universal Carbon Registry (UCR)#6of 8 in AMS-III.C

4.0/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
4.5
Documentation
3.0

Audit Analysis

Chargeup Solution is a newly registered grid-connected renewable energy project (AMS-III.C v16.0) in Delhi NCR with a 3-year crediting period starting November 2025. Only a PDD is available in the extracted record, leaving additionality verification, buffer pool allocation, and independent verification all unconfirmed. The project type carries inherently low permanence risk, but the absence of a verification report and VVB identification creates significant evidence gaps across all dimensions.

Red Flags

  • No verification report or VVB name found in the extracted record — additionality and baseline cannot be independently confirmed
  • Buffer pool percentage not stated, leaving permanence risk unquantified despite the project being in a renewable energy sector
  • CORSIA eligibility and CCP status both unstated, creating uncertainty about dual-channel or over-crediting risk
  • Only a single document (PDD) is available; no monitoring report or verification report to corroborate claims

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not confirmed in extracted record

Permanence

Low inherent risk but buffer pool unstated

Leakage

Negligible with justification, consistent with project type

Baseline

Project-specific baseline, no reassessment date found

Safeguards

Mentioned but FPIC and grievance mechanism not detailed

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-III.C.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents