The İstanbul Airport electrical hydrant dispenser project is a straightforward avoidance-type electrification credit under the AMS-III.C methodology, with VVB-confirmed additionality and no inherent reversal risk. However, multiple data contradictions across documents (grid emission factor, ERR figures, benefit sharing) and a low extraction confidence level raise meaningful questions about the robustness of the underlying calculations. The project is functional but carries moderate data-reliability risk that should be resolved before credits are retired.

Red Flags

  • Grid emission factor discrepancy: the validation report uses 0.44 tCO₂/MWh while an appendix cites 0.7424 tCO₂/MWh; a corrective action was raised to align with the Ministry of Energy publication, but the source of the 0.7424 figure is unexplained
  • Total ERR contradiction: the validation report states 3,003 tCO₂e while an appendix shows 2,240 tCO₂e, a 34% gap that is not reconciled in the available record
  • Benefit-sharing contradiction: the PDD (June 2024) describes a benefit-sharing arrangement, but the validation report (August 2024) records that none is described
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, thin justification

Baseline

Project-specific, measured, no reassessment date

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-III.C

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents