Skip to main content
VCSTransportChina Registry: RegisteredAMS-III.C

Haiweidun electric vehicle in passenger transportation project

VCS-5165 ↗

#86of 204 in China#287of 629 in Verra (VCS)#2of 8 in AMS-III.C

5.5/ 10
Integrity
5.6
Transparency
6.8
Claim Safety
4.2
Documentation
5.5

Audit Analysis

The project has some verification evidence (a recent monitoring report with VVB involvement) but key integrity and claim-safety gaps remain: leakage is not addressed, baseline is project-specific, and there is a contradiction on whether additionality was verified. Documentation is present but incomplete on several technical inputs.

Red Flags

  • Contradictory record on additionality: PDD states not verified while the monitoring report (2024-10-21) reports VVB confirmation.
  • Leakage explicitly listed as not addressed in the monitoring materials; no leakage deduction or justification provided.
  • Key baseline data missing (grid emission factor, leakage deduction percentage, buffer pool percentage)

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB states additionality but PDD contradicts

Permanence

no buffer/reversal detail

Leakage

leakage not addressed

Baseline

project-specific baseline

Safeguards

FPIC and grievance present

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-04-23AMS-III.C

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents