Skip to main content
VCSTransportChile Registry: RegisteredAMS-III.C

Changing the way we move: Electric buses for mining companies

VCS-5454 ↗

#6of 8 in Chile#481of 629 in Verra (VCS)#5of 8 in AMS-III.C

4.7/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

This VCS electric-bus project in Chile has a VVB-confirmed investment additionality test and conservative verified emissions reductions (below pro-rata expectation), but is undermined by 23 material findings, 4 outstanding corrective actions on core calculation parameters, a project-specific baseline, and contradictory safeguard/leakage documentation across the verification report, PDD, and issuance record. The project is registered and CORSIA-ineligible, but the volume of unresolved methodological and documentation gaps significantly weakens confidence in the credit's integrity.

Red Flags

  • 23 material findings (CL01–CL23) identified in the verification report, including missing project ownership evidence, missing legal compliance demonstration, and inability to reproduce emissions calculations (CL20)
  • 4 corrective actions (CAR01–CAR04) remain open on core parameters: fuel consumption option justification, TDLy scenario, EFelect calculation, and vehicle count methodology
  • Leakage justification is contradictory: the verification report (Sep 2025) states 'quantified' while the PDD (Mar 2025) records 'not addressed'
  • Grievance mechanism, benefit sharing, and safeguards are confirmed in the verification report but contradicted as absent in the issuance record (Nov 2025)
  • FPIC was not conducted and multiple safeguard evidence items (risk mitigation, discrimination, forced labor) are flagged as missing (CL13–CL14)

Credit Vintages

IssuedRetiredAvailable
2024
2,26002,260
Total2,26002,260

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance type; buffer pool not stated

Leakage

0% deduction; justification contradicts between PDD and VR

Baseline

Project-specific; parameters not fully explained

Safeguards

Partial; FPIC absent; contradictions in registry record

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-III.C

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents