Skip to main content
VCSEnergy industries (renewable/non-renewable sources)China Registry: RegisteredACM0002

China Xiaogushan Hydropower Project

VCS-36 ↗

#19of 770 in Renewable energy#10of 204 in China#27of 629 in Verra (VCS)#17of 383 in ACM0002

6.8/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
6.5

Audit Analysis

A VCS hydropower project (ACM0002 v5) with a VVB-confirmed investment additionality test, jurisdictional grid baseline, and no reversal events over its 10-year crediting period. The project is notable for a material finding in which the owner voluntarily relinquished 968,299 tCO2e from the final monitoring period, and for several inter-document contradictions that reduce confidence in the extracted record. Overall a standard, low-risk renewable energy project with moderate documentation gaps.

Red Flags

  • Material finding: project owner voluntarily gave up 968,299 tCO2e from the 2013–2016 monitoring period, claiming 0 tCO2e for that period — the reason for this decision is not explained in the available documents.
  • Contradiction in total_err_claimed: the monitoring report (2022) records 0 while the verification report (2022) records 1,006,736 tCO2e for the same date, creating ambiguity about the actual credit volume issued.
  • Buffer pool percentage is not stated in any available document, leaving the permanence risk-mitigation mechanism unquantified.

Credit Vintages

IssuedRetiredAvailable
2006
39,94736,9113,036
Total39,94736,9113,036

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversals

Leakage

0% with negligible justification

Baseline

Jurisdictional EF, doc contradiction

Safeguards

FPIC, grievance, benefit sharing

Double-claim

CORSIA & CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents