Chongqing Chengkou County Bashan Hydropower Station Project
#665of 1935 in Renewable energy#318of 1084 in China#458of 1459 in CDM (UNFCCC)#513of 1287 in ACM0002
Audit Analysis
A CDM small-hydro project with VVB-confirmed additionality and a jurisdictional baseline, but limited monitoring detail, a contradiction in the leakage treatment, and an exact match between claimed and verified ERR that raises questions about independent verification depth. The project is broadly sound for its type but lacks the granular MRV transparency expected of a high-quality credit.
Red Flags
- Total ERR claimed and verified are identical (1,441,594 tCO₂e), suggesting the verification may have simply confirmed the ex-ante estimate rather than independently measuring output over the full 7-year period.
- Contradiction between documents on leakage treatment: the validation report (Aug 2019) states leakage was 'deemed negligible' while an earlier document (Aug 2019) references a 'quantified' approach — the basis for the 0% deduction is unclear.
- No FPIC or grievance mechanism documented despite safeguards being mentioned; benefit-sharing is described but the specific mechanism is not detailed in the extracted record.
- One of the four source documents is listed as 'unknown,' reducing confidence in the completeness of the evidence base.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed, test type unspecified
mixed evidence / unresolved risk
0% deduction, justification contradicted by earlier doc
Jurisdictional grid EF, reassessed 2019
Mentioned, benefit-sharing described, FPIC/grievance absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →