Vai al contenuto principale
GS Biogas - Heat Thailand Documentazione completa General Methodology v2.0

Chumporn applied biogas technology for advanced waste water management

GS-1509 ↗

4.8 / 10
Integrity
5.4
Transparency
4.2
Claim Safety
4.8
Documentation
4.6

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB through an investment test in the verification report.

missing Leakage is not addressed, and reversal risk is not described in the available record.

Transparency

verified The project has a named verifier, TÜV NORD CERT GmbH, and a defined monitoring period in the verification report.

missing Total verified and claimed emission reductions are not stated, and the usage monitoring method is also not found.

Claim Safety

verified The project uses a project baseline under AM0013, which is at least a defined methodology rather than an unstated baseline.

missing The record does not state CORSIA eligibility or CCP status, and leakage justification is marked as not addressed.

Documentation

verified The evidence set includes a PDD, monitoring report, and verification report, with medium extraction confidence.

missing The verification report contains many findings, and the crediting period conflict with the PDD indicates a documentation reliability issue.

Detailed Analysis

Integrity

The verification report confirms additionality through an investment test and says the VVB, TÜV NORD CERT GmbH, validated the project. However, leakage is not addressed, reversal events are not addressed, and there is no buffer pool information, so permanence and leakage robustness remain weak. The large number of findings in the verification report also weighs on integrity.

Transparency

Transparency is only moderate because the project has a named verifier and a clear monitoring period, but key MRV outputs are missing from the extracted record. Total claimed and verified emission reductions are not stated, and the usage monitoring method is not found. The absence of these core figures limits public traceability of the claim.

Claim Safety

Claim safety is constrained by missing evidence on leakage, permanence, and dual-claim status. The project uses a project-specific baseline under AM0013, but there is no stated leakage deduction and no information on CORSIA eligibility or CCP status. The verified usage rate of 74% is helpful, but without the assumed rate or monitoring method it is hard to judge over-crediting risk.

Documentation

Documentation quality is mixed: the record draws on a PDD, monitoring report, and verification report, and the extraction confidence is medium rather than low. Still, the verification report lists seven corrective action requests and three clarifications, which suggests substantial issues during verification. The crediting period in the verification report differs from the PDD, and I privileged the later verification report because it is more recent and reflects the verified status.

Overall

Overall, this is a mid-quality project with some real strengths but notable evidence gaps. I privileged the verification report over the older PDD for the crediting-period discrepancy because it is later and more authoritative for verified status, but the contradiction still lowers reliability. The many findings, missing leakage and permanence information, and incomplete MRV disclosure keep the score below a strong level.

Audit Analysis

The project has some positive integrity signals, including VVB-confirmed additionality and documented safeguards, but the evidence is weakened by many unresolved verification findings and missing information on leakage, permanence, and buffer protection. Transparency is limited because key MRV fields are not stated, and the record contains a crediting-period contradiction between the PDD and verification report that reduces confidence in the documentation.

Project Description

Developer: Deutsche Gesellschaft fuer Internationale Zusammenarbeit GmbH Type: Biogas - Heat Size: Large scale Methodology: AMS-III.I. Avoidance of methane production in wastewater treatment through replacement of anaerobic systems by aerobic systems Crediting period: 2009-02-09 → 2019-02-08 Estimated annual credits: 28133 tCO2e SDGs: Goal 13: Climate Action, Goal 3: Good Health and Well-Being, Goal 7: Affordable and Clean Energy

Red Flags

  • The verification report lists many findings, including seven corrective action requests and three clarifications, which suggests material documentation or implementation issues.
  • Leakage treatment, reversal handling, and buffer pool coverage are not stated in the available documents.
  • The crediting period differs between the PDD and the verification report, and the later verification report was privileged because it is more recent and reflects the verified project status.

Credit Vintages

Issued Retired Available
2009
15,272 0 15,272
2010
30,247 0 30,247
2011
27,698 0 27,698
Total 73,217 0 73,217

Cosa migliorerebbe questo punteggio

  • Publish the monitoring calculations, including verified and claimed emission reductions, usage monitoring method, and any leakage treatment.
  • Provide a clear permanence and registry statement, including buffer pool coverage, reversal handling, and explicit CORSIA/CCP status.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

reversal risk not addressed

Leakage

no leakage treatment stated

Baseline

project baseline, reassessment not stated

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti