Daan Laifu Wind Farm Phase II Project
#1304of 1935 in Renewable energy#785of 1084 in China#1028of 1459 in CDM (UNFCCC)#1012of 1287 in ACM0002
Audit Analysis
The Daan Laifu Wind Farm Phase II is a CDM wind project with a jurisdictional baseline and appropriate leakage treatment, but the extracted record lacks explicit additionality documentation, monitoring data, and CORSIA/CCP eligibility information. A material finding regarding the build margin emission factor calculation was raised and a corrective action was required, indicating a methodological gap that was subsequently addressed. The ERR figure discrepancy between the PDD and validation report is explainable as an annual-versus-seven-year-total difference but reflects inconsistent reporting.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving a gap in verifying a core CDM requirement
- Material finding (CAR 1) identified an inconsistency in the build margin emission factor calculation method in PDD v3.0, requiring revision to align with Tool v7.0
- No monitoring reports or monitoring period data found despite the crediting period beginning in September 2020
- CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 238,232 | 0 | 238,232 | |
| 2022 | 378,514 | 0 | 378,514 | |
| Total | 616,746 | 0 | 616,746 |
Risk Indicators
Test type not stated in extracted record; CDM validation imp
Wind avoidance project; no reversal risk; no reversal events
0% deduction with 'deemed negligible' justification; appropr
Jurisdictional baseline; 2020 grid EF (0.9139); standardised
Safeguards mentioned and benefit sharing described, but no F
CORSIA eligibility and CCP status not stated in available do
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →