Datong River Zhuchaxia Hydropower Station
Score Breakdown
Integrity
verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test.
missing Baseline is project-specific and the timing of any baseline reassessment is not stated in the extracted record.
Transparency
verified The monitoring period is clearly stated (2015-12-30 to 2018-03-23) and the claimed and verified totals match in the latest record (293,331).
missing Multiple cross-document inconsistencies (ERR totals, crediting period, safeguards) reduce transparency and traceability.
Claim Safety
verified Claimed and verified emission reductions match in the latest monitoring record, and no material findings/corrective actions are reported.
missing CORSIA and CCP status are not stated in the extracted record, and leakage justification is weak (0% with leakage not addressed in the latest monitoring report).
Documentation
verified A relatively complete document set is referenced (PDD, validation report, monitoring report, issuance) with 12 documents used and high extraction confidence.
missing Contradictions between older validation/monitoring documents and later documents indicate recordkeeping and version-control weaknesses.
Detailed Analysis
Integrity
The validation/verification record indicates additionality was confirmed by the VVB via an investment test (validation report, 2021-06-30; additionality type also noted in the extracted record). The baseline approach is project-specific under ACM0002, and the timing of any baseline reassessment is not stated in the extracted record, which weakens confidence in baseline continued validity. Leakage is treated as a 0% deduction, but the latest monitoring report (2021-08-14) does not address leakage, which is a substantive integrity weakness for a grid-displacement project. No material findings or corrective actions are reported in the extracted record, supporting moderate integrity despite the gaps.
Transparency
Key MRV elements are present, including a named VVB (China Classification Society Certification Company) and a clearly stated monitoring period (2015-12-30 to 2018-03-23) in the monitoring report (2021-08-14). In the latest record, total claimed and verified emission reductions are the same (293,331), which is a positive transparency signal. However, multiple contradictions across documents (including different ERR totals and different crediting period dates) reduce confidence that the public record is internally consistent and easy to audit end-to-end.
Claim Safety
Over-crediting risk is elevated by weak leakage substantiation: the monitoring report (2021-08-14) shows a 0% leakage deduction while also not addressing leakage, and an earlier monitoring report (2012-04-12) instead deems leakage negligible. The project uses a project-specific baseline under ACM0002 and the baseline reassessment timing is not stated in the extracted record, which adds uncertainty around baseline conservativeness over time. CCP status and CORSIA eligibility are not stated in the extracted record, limiting confidence for high-integrity claims in markets that screen for these labels.
Documentation
The extracted record references a reasonably complete set of evidence types (PDD, monitoring report, validation report, issuance) and indicates 12 documents were used with high extraction confidence, supporting a solid documentation score. No corrective actions are reported, which suggests the documentation set did not flag unresolved issues. Nonetheless, the presence of several contradictions between older and newer documents indicates documentation/version-control weaknesses that should be resolved for stronger auditability.
Overall
The largest reliability issue is contradictory emission reduction totals: 293,331 appears in the more recent validation/monitoring record (validation report, 2021-06-30; monitoring report, 2021-08-14), while 180,792 appears in older documents (monitoring report, 2012-04-12; validation report, 2012-04-12). I privilege the more recent figures because they are later-dated and align between claimed and verified totals in the latest monitoring record, but the inconsistency still lowers scores due to traceability risk. Leakage justification also conflicts ("not addressed" in 2021-08-14 vs "deemed negligible" in 2012-04-12); I privilege the latest monitoring report’s characterization, which is worse and therefore increases conservativeness. Safeguards/FPIC, grievance mechanism, and benefit sharing are reported in the 2021 monitoring report but not in the 2009 validation report; I treat this as partial/inconsistent safeguards documentation rather than fully robust safeguards. The crediting period conflict (2008-03-24 to 2018-03-23 in 2021 monitoring vs 2009-12-18 to 2019-12-17 in 2012 validation) is unresolved and further reduces confidence in administrative consistency.
Audit Analysis
This VCS hydropower project shows some core integrity strengths (VVB-confirmed investment additionality and no reported findings), but it has notable internal inconsistencies across documents on credited volumes and even the crediting period. Leakage treatment is weakly supported (0% deduction with leakage not addressed in the latest monitoring record), increasing over-crediting risk for an ACM0002 grid-displacement project.
Project Description
A hydro-power project was constructed on the Datong River to generate zero-emission electricity for the local power grid. The project included a concrete gravity dam, release sluice, channels, powerhouse, and switch station. The hydrological resources of the Datong River were utilized to ensure the success of the project.
Red Flags
- Conflicting credited emission reductions across documents (293,331 vs 180,792), undermining confidence in MRV consistency.
- Leakage is taken as 0% while the latest monitoring record does not address leakage, weakening the basis for a zero deduction.
- Safeguards/FPIC and grievance mechanism are inconsistently reported between early validation and later monitoring documents.
- Crediting period dates conflict between documents, raising registry/administrative reliability concerns.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 127,529 | 107,598 | 19,931 | |
| 2015 | 340 | 340 | 0 | |
| 2016 | 150,775 | 137,925 | 12,850 | |
| 2017 | 11,675 | 9,000 | 2,675 | |
| 2018 | 22,672 | 2,540 | 20,132 | |
| Total | 312,991 | 257,403 | 55,588 |
Cosa migliorerebbe questo punteggio
- Publish a clear reconciliation table linking each monitoring period to issuance quantities and explaining why older documents show 180,792 while later documents show 293,331.
- Provide an explicit leakage assessment consistent with ACM0002 requirements (or a documented justification for negligible leakage) and ensure it is consistently stated across monitoring reports.
- Clarify the official crediting period and align it across registry, validation, and monitoring documentation (including any renewals/updates).
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project; no reversals reported
0% deduction with weak/contradictory justification
Project-specific baseline; reassessment timing unclear
Safeguards/FPIC and grievance inconsistently documented
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →