Skip to main content
GSEnergy Efficiency - DomesticGuatemalaGeneral Methodologyv2.0

Ecofiltro Guatemala Improved Stoves and Water Purification Project

GS-1662 ↗ · current registry ID: GS1321

#118of 202 in Industrial#3of 5 in Guatemala#285of 426 in Gold Standard (GS)

4.9/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A long-running Gold Standard domestic energy-efficiency project (improved stoves and water filters in Guatemala) with verified additionality and no reversal events, but plagued by an unusually large volume of material findings, data-quality inconsistencies, and multiple deviations requiring credit removals. The absence of a buffer pool, a 0% leakage deduction justified only as 'negligible,' and a project-specific baseline limit the robustness of the claims. The VVB (Carbon Check India) caught most issues and required corrections, but the sheer number of corrective actions signals weak internal QA/QC.

Red Flags

  • Over 50 material findings across verification reports, including formula errors in the ER calculation spreadsheet, mismatches in total Ecofiltro counts, and inconsistencies between sales databases and paper records
  • Two separate deviations required removal of 19,918 tCO2e and 16,713 tCO2e from issued credits, indicating prior over-issuance
  • No buffer pool is in place (not stated in any available document), leaving no financial backstop against potential reversals or over-crediting
  • Leakage deduction of 0% justified only as 'deemed negligible' without a quantified assessment, despite a project type where households could purchase additional fuelwood or resell filters
  • Only 60% of bulk sales had signed Carbon Rights Waivers at the time of verification, raising double-claiming and ownership risks

Credit Vintages

IssuedRetiredAvailable
2013
35,32135,3210
2014
165,780165,7800
2015
277,110277,1100
2016
150,559150,5590
2017
168,215168,2150
2018
136,118136,1180
2019
116,209116,2090
2020
115,473113,9221,551
2021
137,803135,3872,416
2022
217,454138,21379,241
2023
237,16816,223220,945
Total1,757,2101,453,057304,153

Risk Indicators

Additionality

VVB-confirmed common-practice test

Permanence

No buffer pool; no reversals (avoidance project)

Leakage

0% deduction, 'negligible' justification only

Baseline

Project-specific baseline, reassessed 2020

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents