Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.0

GS VER UpEnergy's Uganda Biomass Cookstove Project

GS-39 ↗ · current registry ID: GS1044

#59of 202 in Industrial#7of 23 in Uganda#172of 426 in Gold Standard (GS)

5.4/ 10
Integrity
4.5
Transparency
6.5
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A Gold Standard biomass cookstove project in Uganda with VVB-confirmed additionality and a conservative verified usage rate (0.7956 vs 0.9 assumed), but undermined by an extensive list of material findings and corrective actions, absence of a buffer pool, unaddressed reversal risk, and no FPIC. Multiple contradictions across verification reports raise concerns about data consistency over time.

Red Flags

  • Over 40 material findings and 14 corrective actions across verification reports, including errors in ER calculations, stove counts, and methodology references
  • No buffer pool or permanence mechanism identified; reversal events explicitly 'not addressed' for a project where stoves can break or be replaced
  • FPIC not conducted despite a domestic cookstove project in a developing-country context
  • Leakage justification shifted from 'quantified' (2023) to 'deemed negligible' (2025) without clear explanation
  • Additionality test type inconsistent between the validation report (barrier) and the PDD (investment)

Credit Vintages

IssuedRetiredAvailable
2011
8598590
2012
19,18319,1830
2013
35,99935,9990
2014
24,31324,3130
2015
4,0254,0250
2019
49,65539349,262
2020
154,845153,5071,338
2021
114,94893,15021,798
2022
101,32679,64421,682
2023
86,81454,13732,677
2024
63,93862,6601,278
Total655,905527,870128,035

Risk Indicators

Additionality

VVB-confirmed (barrier/investment test)

Permanence

No buffer pool; reversal not addressed

Leakage

0% deemed negligible; prior quantified treatment unexplained

Baseline

Project-specific; last reassessed 2021

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents