Skip to main content
GSEnergy Efficiency - DomesticIndiaGeneral Methodologyv2.0

EFFICIENT KITCHENS IN GUJARAT, UTTAR PRADESH AND MADHYA PRADESH -VPA02

GS-4450 ↗ · current registry ID: GS12533

#39of 203 in Industrial#137of 385 in India#120of 427 in Gold Standard (GS)

5.6/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.0
Documentation
6.0

Audit Analysis

A Gold Standard improved-cookstove project in India with VVB-confirmed additionality and a locally measured FNRB, but undermined by the discovery of 131 duplicate stoves, an unaddressed reversal risk, no buffer pool, and a long list of corrective actions. The project is functional and transparent in its MRV approach, yet the over-crediting risk flagged by the duplicate finding and the project-specific baseline warrant caution before claiming at face value.

Red Flags

  • 131 Jumbo stoves were identified as duplicates in another Gold Standard project (GS10818) and had to be removed from the database, indicating a material over-crediting risk that was only caught during verification
  • Reversal events are explicitly not addressed in the available documents, and no buffer pool percentage is stated, leaving the permanence of the claimed emissions reductions unsecured
  • Twenty corrective actions were required by the VVB, spanning PoA documentation, stakeholder consultation, safeguards assessment, and additionality justification, suggesting the project documentation was not fully robust at the time of verification

Credit Vintages

IssuedRetiredAvailable
2023
7,1777,1770
2024
40,508040,508
2025
18,585018,585
Total66,2707,17759,093

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool; reversal not addressed

Leakage

5% quantified deduction

Baseline

Project-specific, reassessed 2025

Safeguards

FPIC and grievance present; 20 corrective actions on safegua

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents