Biodigesters program for a low-carbon livestock sector in Vietnam (BioLive)

GS-3660 ↗ · current registry ID: GS11568

#16of 111 in Biogas#8of 25 in Vietnam#115of 426 in Gold Standard (GS)

5.6/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
5.0
Documentation
6.0

Audit Analysis

The BioLive biodigester project in Vietnam has a solid additionality foundation (combined test confirmed by the VVB) and a conservative 10% leakage deduction, but is undermined by the absence of a stated buffer pool, unresolved material findings (including 1,421 digesters missing from the survey), and nine cross-document contradictions that erode confidence in the data. The project is mid-crediting-period with a recent monitoring cycle, yet the verified ERR figure is not available in the extracted record, limiting the ability to confirm delivery against the ex-ante estimate.

Red Flags

  • 1,421 biodigesters were excluded from the current monitoring survey (FAR #1), with corrective action only to sample 65 of them in the next cycle — a material coverage gap in the MRV chain.
  • Buffer pool percentage is not stated in any available document, leaving permanence risk for a biogas project unquantified.
  • Nine contradictions across documents, including a 10% vs 0% leakage deduction discrepancy and a 79,268 vs 64,820 tCO₂e ERR discrepancy, raise data-reliability concerns.
  • The verification report marks reversal events as 'not addressed' while the more recent monitoring report states 'none reported' — the verification-level assessment is incomplete.
  • FPIC status is contradictory: the verification report (Mar 2025) confirms it was conducted, but the monitoring report (Dec 2023) records it as not conducted.

Credit Vintages

IssuedRetiredAvailable
2021
9,8648,6291,235
2022
28,34628,3460
2023
51,44230,61320,829
2024
54,436054,436
Total144,08867,58876,500

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Buffer pool not stated; reversal not addressed in VR

Leakage

10% quantified deduction (VR)

Baseline

Project-specific; no reassessment date

Safeguards

FPIC contradictory; grievance present

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents