Erzurum Aziziye Solar Power Plant

GS-1888 ↗ · current registry ID: GS7493

#153of 770 in Renewable energy#34of 121 in Turkey#68of 426 in Gold Standard (GS)#49of 417 in AMS-I.D

5.9/ 10
Integrity
6.0
Transparency
6.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

The Erzurum Aziziye Solar Power Plant is a Gold Standard solar electricity project with VVB-confirmed additionality and conservative delivery (2.2% below ex-ante expectation). However, the project-specific baseline, absence of a stated buffer pool, multiple corrective actions during verification, and gaps in FNRB and CORSIA/CCP documentation limit confidence in the credit's robustness.

Red Flags

  • Project-specific baseline method (not jurisdictional) increases sensitivity to local grid assumptions; the 2025 verification report states 'project' while the 2024 monitoring report references 'jurisdictional', creating ambiguity about which baseline actually applies.
  • Buffer pool percentage is not stated in any available document, leaving permanence risk unquantified despite the project being an avoidance-type activity.
  • 15 Corrective Action Requests and 9 additional CARs were issued across verification cycles, including a project-type mislabelled as 'wind' instead of 'solar' and a CP renewal deviation that was not approved, indicating recurring documentation quality issues.
  • FPIC status is contradictory: the 2025 verification report confirms FPIC was conducted, while the 2023 PDD records it as not conducted.

Credit Vintages

IssuedRetiredAvailable
2019
12,70412,7040
2020
12,7337,6865,047
2021
13,06226112,801
2022
12,626012,626
2023
11,756011,756
2024
11,169011,169
2025
3,96703,967
Total78,01720,65157,366

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, low inherent reversal risk

Leakage

0% deduction, quantified justification

Baseline

Project-specific, not jurisdictional

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents