Everbright Suqian & Huaining Bundled Solar PV Power Generation Project
Score Breakdown
Integrity
verified The verification report from TÜV NORD reports no material findings and no corrective actions required.
missing Additionality is not stated in the available extraction, and leakage treatment is marked as not addressed despite a zero deduction.
Transparency
verified The monitoring period and crediting period are both stated, and the project has a named verifier and a dated verification report.
missing Key MRV fields such as total ERR claimed versus verified, usage monitoring method, and FNRB information are not found in the extracted record.
Claim Safety
verified The project uses a project baseline under AMS-I.D and reports a grid emission factor, which is at least directionally consistent with a renewable electricity claim.
missing Leakage justification is not addressed, and CORSIA eligibility and CCP status are not stated, leaving residual claim-risk uncertainty.
Documentation
verified Four documents were used and the extraction confidence is medium rather than low.
missing The extracted record is incomplete on several important fields, including buffer pool treatment, reversal handling, and additionality evidence.
Detailed Analysis
Integrity
The verification report dated 2013-09-13 from TÜV NORD states no material findings and no corrective actions required, which supports basic project credibility. However, the extracted record does not state the additionality test type or confirm additionality by the VVB, and leakage is marked as not addressed even though a 0% deduction is shown. Baseline reassessment is only noted for 2012, so the overall integrity case is moderate rather than strong.
Transparency
Transparency is limited by missing MRV detail in the extracted record. The monitoring period and crediting period are stated, and the verifier is named, but total ERR claimed versus verified, usage monitoring method, and FNRB information are not found. The medium extraction confidence helps, but the record still lacks enough public-facing detail to score highly.
Claim Safety
Claim safety is weakened by unresolved accounting and eligibility questions. The project uses a project baseline under AMS-I.D and reports a grid emission factor of 0.81415, but leakage justification is not addressed and the record does not state CORSIA eligibility or CCP status. Because the extracted facts do not show over-crediting controls such as verified usage rates or a clearly documented leakage rationale, the claim should be treated conservatively.
Documentation
Documentation quality is middling: four documents were used, the extraction confidence is medium, and the verification report is dated and identifiable. At the same time, several important fields are missing from the extracted record, including buffer pool treatment, reversal handling, and additionality evidence. The absence of corrective actions is positive, but the overall documentation set is incomplete for a high-confidence assessment.
Overall
There are no contradictions listed in the extracted record, so no conflict resolution is needed. The main limitation is not inconsistency but missing evidence: several key quality fields are absent or not stated, especially around additionality, leakage, permanence, and market-claim eligibility. Given the moderate documentation quality and the unresolved leakage treatment, the project scores in the middle range rather than as a high-confidence credit.
Audit Analysis
This is a renewable electricity project with a verified report from TÜV NORD and no material findings, but the extracted record leaves several core quality questions unresolved. Additionality is not clearly documented, leakage is marked as not addressed despite a zero deduction, and permanence-related information is incomplete, so the project should be treated cautiously.
Project Description
Developer: Innovative Carbon Investment Co., Ltd. Type: Solar Thermal - Electricity Size: Small Scale Methodology: AMS-I.D. Grid connected renewable electricity generation Crediting period: 2012-04-01 → 2019-03-31 Estimated annual credits: 8770 tCO2e SDGs: Goal 13: Climate Action, Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth
Red Flags
- Additionality is not clearly evidenced in the extracted record, and the verification report does not show a stated test or VVB-confirmed additionality.
- Leakage is listed as not addressed even though a 0% deduction was applied, which weakens confidence in the treatment of project emissions accounting.
- No buffer pool, reversal handling, or usage monitoring details were found in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 5,800 | 0 | 5,800 | |
| 2013 | 1,863 | 0 | 1,863 | |
| Total | 7,663 | 0 | 7,663 |
Cosa migliorerebbe questo punteggio
- Provide the underlying additionality assessment and any VVB confirmation, including the exact test used and supporting evidence.
- Disclose leakage rationale, reversal/buffer treatment, and the project’s CORSIA and CCP status with complete MRV figures.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
additionality not clearly evidenced
reversal treatment not documented
0% deduction but justification missing
project baseline, reassessment timing limited
FPIC and grievance mechanism present
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →