FANAPEL Biomass-based CHP
#133of 180 in Biomass#9of 10 in Uruguay#1294of 1453 in CDM (UNFCCC)#45of 64 in AMS-I.C
Audit Analysis
The FANAPEL Biomass-based CHP project in Uruguay has a VVB-confirmed additionality assessment and a standardised CDM methodology (AMS-I.C v19), but the available record is limited to validation-stage documents from 2013 with no monitoring or verification reports. Two material contradictions between the PDD and the validation report (grid emission factor and baseline method) reduce confidence in the baseline, and the absence of any verified emissions reductions data prevents any assessment of actual delivery against the 12,186 tCO₂e lifetime claim.
Red Flags
- Grid emission factor differs between the PDD (0.612) and the validation report (0.55), creating uncertainty about the baseline calculation basis
- Baseline method is stated as 'project-specific' in the validation report but 'jurisdictional' in the PDD — a fundamental classification discrepancy
- No monitoring reports or verification reports are available for the full 2013–2020 crediting period; actual emissions reductions are unverified
- Eleven material findings were raised at validation, including incomplete additionality evidence, unclear monitoring calibration, and a double-counting concern in the cogeneration capacity limit
- Leakage is described as 'quantified' in the validation report but no deduction percentage or methodology is found in the extracted record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
No buffer pool or reversal data; fuel-supply continuity unad
Stated as quantified but no deduction value found
Project-specific per VVB; contradicts PDD; no reassessment d
Mentioned and benefit-sharing described; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →