Skip to main content
PURBiochar, 2022CambodiaGeneral Methodologyv2.0

Foundation 1

PUR-526866 ↗

#8of 44 in Biochar#5of 12 in Cambodia#16of 109 in Puro.earth (PUR)

5.5/ 10
Integrity
6.0
Transparency
5.0
Claim Safety
5.0
Documentation
6.0

Audit Analysis

Foundation 1 is a Puro.earth biochar project in Cambodia with a VVB-confirmed investment additionality test, a 10% buffer pool, and documented safeguards including FPIC and a grievance mechanism. However, leakage treatment is entirely absent from the available record, the baseline is project-specific with no reassessment date, and the verified ERR for a ~2.5-month monitoring period (340.76 tCO₂e) is roughly 25× the pro-rata share of the 5-year ex-ante estimate (338.49 tCO₂e), raising questions about the robustness of the original quantification.

Red Flags

  • Verified ERR of 340.76 tCO₂e for a ~72-day monitoring period is approximately 25× the pro-rata expectation (~13.4 tCO₂e) derived from the 5-year ex-ante estimate of 338.49 tCO₂e, suggesting either a highly front-loaded production profile or a potential error in one of the figures.
  • No leakage deduction or justification is stated in any available document, despite biochar projects carrying inherent displacement and substitution leakage risk.
  • Two contradictions between the PDD and the verification report (additionality test type and FPIC status) indicate inconsistent project documentation.

Credit Vintages Exhausted

IssuedRetiredAvailable
2026
3403400
Total3403400

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

10% buffer pool; reversal events not stated

Leakage

No deduction or justification in record

Baseline

Project-specific; no reassessment date

Safeguards

FPIC confirmed; grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents