Skip to main content
PURBiochar, 2022BoliviaGeneral Methodologyv2.0

Exomad Green, Riberalta

PUR-292788 ↗

#40of 44 in Biochar#2of 5 in Bolivia#92of 109 in Puro.earth (PUR)

3.9/ 10
Integrity
3.5
Transparency
4.5
Claim Safety
3.5
Documentation
4.5

Audit Analysis

The Exomad Green biochar project in Bolivia demonstrates verified additionality and appropriate safeguards (FPIC, grievance mechanism), but the verification process uncovered 19 material findings including multiple calculation errors, a 139.76 CORC soil-temperature overcalculation, and a near-doubling of the verified ERR between the initial and final verification reports. Leakage is entirely unaddressed, no buffer pool is documented, and the project-specific baseline lacks a stated reassessment date, collectively undermining confidence in the integrity and safety of the claimed credits.

Red Flags

  • 19 material findings identified in the verification report, including a 139.76 CORC overcalculation from an incorrect soil temperature value and a 14.83 CORC double-counting error in biomass and production emissions
  • Verified ERR more than doubled between the initial verification (5,068.47 CORCs, Feb 2026) and the final verification (10,835.61 CORCs, Apr 2026) for the same 26-day monitoring period, indicating a fundamental calculation error in the initial report
  • Leakage is not addressed at all in the available documents, with no deduction or justification provided for a biochar project where displaced carbon sequestration is a plausible pathway
  • No buffer pool percentage is documented, leaving no quantified safeguard against potential carbon re-mobilization from the biochar
  • Used lubricants and greases are accumulating on site pending disposal, flagged as a recurring environmental concern across multiple material findings

Credit Vintages Exhausted

IssuedRetiredAvailable
2024
12,79912,7990
2025
73,73473,7340
2026
31,02331,0230
Total117,556117,5560

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

Biochar inherently stable; no buffer pool documented

Leakage

Not addressed in any document

Baseline

Project-specific; no reassessment date stated

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents