Novocarbo Baltic Sea
#21of 44 in Biochar#3of 5 in Germany#41of 109 in Puro.earth (PUR)
Audit Analysis
The Novocarbo Baltic Sea biochar project has a VVB-confirmed investment additionality test and a 16.5% buffer pool, but the verification report identified seven material findings including potentially inflated production data, expired sustainability certifications, and unaccounted emissions from chipping and transport. The absence of a verified ERR figure, leakage treatment, and FNRB value creates meaningful uncertainty around the 133,084 tCO₂e lifetime claim. Corrective actions are specified but remain open, leaving the project in a provisional state.
Red Flags
- Seven material findings in the verification report, including potentially inflated manufacturer-specification data, expired FSC/PEFC/SURE-EU certifications, and a moisture content assumption (20%) that underestimates actual lab values (23.1% and 26.7%), all of which could overstate net CO₂ removals.
- No verified ERR figure is available in the extracted record; the 133,084 tCO₂e figure is a lifetime ex-ante estimate with no monitoring-period verification to confirm delivery.
- Six corrective actions remain open, including recalculation of CO₂eq based on actual production output and accounting for previously omitted chipping and transport emissions.
- Leakage treatment is entirely absent from the available documents — no deduction percentage, no justification, and no methodology reference.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 309 | 309 | 0 | |
| 2025 | 207 | 207 | 0 | |
| Total | 516 | 516 | 0 |
Risk Indicators
VVB-confirmed investment test
16.5% buffer pool; no reversal data stated
No deduction or justification found
Project-specific; no reassessment date
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →