Skip to main content
PURBiochar, 2022ColombiaGeneral Methodologyv2.0

Guaicaramo

PUR-389138 ↗

#22of 44 in Biochar#12of 18 in Colombia#43of 109 in Puro.earth (PUR)

4.8/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
4.0
Documentation
5.5

Audit Analysis

The Guaicaramo biochar project has a VVB-confirmed combined additionality test and a functioning verification process that surfaced five material findings, but the absence of a stated buffer pool, leakage treatment, and permanence safeguards for a biochar project is a significant integrity gap. The verified ERR of 106.04 tCO₂e for the first 13-month monitoring period is roughly 440% of the pro-rata expectation from the 110.85 tCO₂e five-year claim, yet the material findings (LCA boundary error, soil-temperature underestimation, inventory logic error) indicate the verified figure is likely overstated and will be reduced after corrective actions. Overall, the project shows a credible verification process but carries meaningful over-crediting and permanence risk.

Red Flags

  • Five material findings in the verification report, including an LCA that initially omitted cradle-to-grave emissions from biochar soil application, a soil-temperature assumption 5 °C below the regional average, and a FIFO inventory logic error — all of which suggest the verified ERR of 106.04 tCO₂e is likely overstated.
  • No buffer pool percentage or permanence safeguard is stated in the extracted record for a biochar project where carbon storage is the core credit mechanism and reversal risk is inherent.
  • Leakage deduction and justification are not stated in any available document, leaving the treatment of displaced or shifted emissions unaddressed.
  • Six corrective actions are required before the verification can be considered clean, including recalculation of t.km, inclusion of missing electricity and biogas records, and a full LCA boundary correction.

Credit Vintages Exhausted

IssuedRetiredAvailable
2026
1061060
Total1061060

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

No buffer pool or reversal history stated

Leakage

Not stated in available documents

Baseline

Project-specific, no reassessment date

Safeguards

Grievance & benefit sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents