Nian'da Biochar Facility
#34of 44 in Biochar#176of 204 in China#79of 109 in Puro.earth (PUR)
Audit Analysis
The Nian'da Biochar Facility has a VVB-verified additionality assessment but suffers from significant gaps in permanence, leakage, and data quality. The most alarming issue is that the verified emissions reduction for a single 10-month monitoring period (330.96 tCO₂e) represents 97.8% of the entire 5-year lifetime claim (338.32 tCO₂e), raising serious over-crediting concerns. Multiple corrective actions related to LCA data inconsistencies and untraceable inputs further undermine confidence in the project's claims.
Red Flags
- Verified ERR of 330.96 tCO₂e in a 10-month monitoring period equals 97.8% of the 5-year lifetime claim of 338.32 tCO₂e — a 587% over-delivery against pro-rata expectation, suggesting a fundamental error in either the baseline estimate or the monitoring data
- Reversal events are explicitly 'not addressed' and no buffer pool percentage is stated, leaving biochar carbon permanence risk entirely unquantified
- Three corrective actions (CARs) flag LCA emission calculation inputs as untraceable and data inconsistencies in biomass quantity, steel types, electricity invoices, and flue gas sources
- Leakage deduction and justification are entirely absent from the extracted record for a biochar project where displaced biomass use is a plausible leakage pathway
- FPIC was not conducted despite the project being in a community context in China
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2025 | 330 | 330 | 0 | |
| Total | 330 | 330 | 0 |
Risk Indicators
VVB-verified investment test
Reversal risk unaddressed, no buffer pool
No deduction or justification stated
Project-specific, no reassessment date
Grievance mechanism present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →