Skip to main content
PURBiochar, 2022United KingdomGeneral Methodologyv2.0

BBB - Ahlstrom_Radcliffe

PUR-511686 ↗

#3of 44 in Biochar#1of 8 in United Kingdom#4of 109 in Puro.earth (PUR)

5.9/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.5
Documentation
6.5

Audit Analysis

The Black Bull Biochar project at Ahlstrom Radcliffe demonstrates a solid additionality case confirmed by the VVB via an investment test, and the first monitoring period shows strong over-delivery relative to the lifetime estimate. However, several material findings around measurement accuracy and LCA completeness, combined with the absence of a stated leakage treatment and buffer pool, leave meaningful gaps in the integrity and transparency picture.

Red Flags

  • Five material findings in the verification report, including LCA omissions (diesel, wastewater) and biochar mass measurement limitations, with four corrective actions still pending
  • Leakage deduction and justification are not stated in any available document, leaving the treatment of potential biochar loss or misapplication unaddressed
  • No buffer pool percentage or explicit permanence risk assessment found in the extracted record for a sequestration-type project

Credit Vintages Exhausted

IssuedRetiredAvailable
2025
99990
Total99990

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Biochar inherently stable; no buffer pool or explicit perman

Leakage

Not quantified or justified in available documents

Baseline

Project-specific baseline; no reassessment date stated

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents