Fasera Biochar Plant 1

PUR-607941 ↗

#33of 44 in Biochar#9of 10 in Australia#78of 109 in Puro.earth (PUR)

4.2/ 10
Integrity
3.5
Transparency
4.5
Claim Safety
4.0
Documentation
5.5

Audit Analysis

Fasera Biochar Plant 1 is a Puro-registered biochar project in Australia with VVB-confirmed additionality, but the December 2025 verification report identified 12 material findings spanning measurement errors, LCA deficiencies, and calibration gaps, alongside 8 required corrective actions. Key permanence and leakage parameters are absent from the available record, and ERR figures show contradictions between the 2024 and 2025 verification reports. The project's data quality and MRV robustness are currently below the threshold for high-confidence carbon claims.

Red Flags

  • 12 material findings in the December 2025 verification report, including incorrect H/Corg ratios, unaccounted biochar stock, uncalibrated diesel meter, and LCA verification failures
  • No buffer pool or permanence mechanism documented for a biochar project where carbon storage is the core claim
  • Leakage treatment (deduction or justification) not stated in any available document
  • Contradictions in ERR figures: the August 2024 report shows claimed 264 / verified 268, while the December 2025 report shows claimed 203.93 / verified 142.02
  • 8 corrective actions required, indicating systemic MRV and calculation gaps that undermine confidence in the verified figure

Credit Vintages Exhausted

IssuedRetiredAvailable
2024
2682680
2025
1421420
Total4104100

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

No buffer pool or permanence mechanism documented

Leakage

Not stated in available documents

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC and grievance mechanism not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents