Wakefield Biochar Facility 4

PUR-517437 ↗

#44of 44 in Biochar#75of 115 in United States#109of 109 in Puro.earth (PUR)

2.4/ 10
Integrity
2.0
Transparency
3.0
Claim Safety
2.0
Documentation
3.0

Audit Analysis

The Wakefield Biochar Facility 4 project exhibits severe integrity concerns, including a negative credit balance of over 5,300 CORCs, ineligible biochar stock, and a mid-period methodology change. A direct contradiction between two verification reports (915 vs 3,272 verified CORCs) undermines confidence in the reported figures. Fundamental parameters such as additionality, baseline method, and leakage treatment are absent from the available documentation.

Red Flags

  • Negative balance of -5,396 CORCs reported in the verification report, indicating the project performed far below its baseline assumptions during the monitoring period
  • Contradiction between two verification reports: 915.03 CORCs (Dec 2025) vs 3,272.23 CORCs (Nov 2025) for the same monitoring period — a 3.5× discrepancy
  • 118.39 CORCs over-calculated due to ineligible biochar stored at WIC lacking transport-emissions evidence
  • Mid-period change in measurement methodology (from shipped biochar mixed with ash/lime to before-mixing measurements) without clear justification
  • No additionality test, baseline method, or leakage treatment found in any available document

Credit Vintages Exhausted

IssuedRetiredAvailable
2025
4,1874,1870
Total4,1874,1870

Risk Indicators

Additionality

No additionality test found in any document

Permanence

No buffer pool stated; no reversal events reported but also

Leakage

No leakage deduction or justification found

Baseline

Baseline method not stated in available documents

Safeguards

Safeguards mentioned but no FPIC, grievance mechanism, or de

Double-claim

CORSIA and CCP status not stated; dual-channel risk unassess

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents