Brodie Biomass
#4of 44 in Biochar#2of 8 in United Kingdom#10of 109 in Puro.earth (PUR)
Audit Analysis
Brodie Biomass is a first-year UK biochar project under Puro with a verified investment-test additionality and a named VVB, but the initial verification surfaced five material findings—including a 14.7-tonne overcalculation, 12.22 tonnes of PAH-exceeding ineligible biochar, and a website double-claiming risk—each requiring corrective action. The absence of a stated buffer pool and a project-specific baseline leave meaningful permanence and baseline-robustness gaps for a carbon-removal credit.
Red Flags
- Five material findings in the first verification report, including a 14.7 CORC overcalculation and 12.22 tonnes of biochar exceeding EBC PAH thresholds, indicating weak initial MRV controls.
- No buffer pool percentage is stated in the extracted record, leaving permanence risk for a biochar project unquantified.
- The project operator's website previously carried a misleading carbon-removal disclaimer that risked double counting; corrected only after the VVB flagged it.
- Leakage is deemed negligible with no quantified deduction or detailed justification beyond a single label.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2025 | 1,416 | 1,416 | 0 | |
| Total | 1,416 | 1,416 | 0 |
Risk Indicators
Investment test, VVB-confirmed
No buffer pool stated; no reversal events recorded
Deemed negligible, no quantified deduction
Project-specific, no reassessment date stated
Grievance mechanism present; FPIC not conducted
CORSIA/CCP not stated; website risk corrected
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →