Skip to main content
PURBiochar, 2022BrazilGeneral Methodologyv2.0

NetZero-003-Brejetuba

PUR-566645 ↗

#12of 44 in Biochar#35of 104 in Brazil#22of 109 in Puro.earth (PUR)

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
6.5

Audit Analysis

The Brejetuba biochar project has a VVB-verified investment additionality test and documented safeguards (FPIC, grievance mechanism), but suffers from significant gaps in permanence assurance (no buffer pool, reversal not addressed, corrective action to prohibit combustion in sales agreements) and multiple unquantified parameters (FNRB, usage rate, leakage deduction). The verified ERR for the first monitoring year appears to substantially exceed the pro-rata share of the lifetime estimate, raising over-crediting concerns.

Red Flags

  • Verified ERR (1,153.71 tCO2e) for the 2024-11 to 2025-10 monitoring period is approximately 5× the pro-rata expectation derived from the lifetime estimate of 1,145.88 tCO2e over the 5-year crediting period, suggesting potential over-crediting
  • No buffer pool or reversal mechanism documented; the VVB issued a corrective action requiring sales agreements to explicitly prohibit combustion of the biochar, indicating an unmitigated permanence risk
  • FNRB value, usage rate (assumed and verified), and grid emission factor are all absent from the extracted record, leaving key quantification parameters unverified
  • Leakage is deemed negligible without a quantified deduction or detailed justification beyond a brief statement about moisture content and low fire incidence

Credit Vintages Exhausted

IssuedRetiredAvailable
2025
1,2701,2700
Total1,2701,2700

Risk Indicators

Additionality

VVB-verified investment test

Permanence

No buffer pool; combustion risk flagged by VVB

Leakage

Deemed negligible, no quantified deduction

Baseline

Project-specific; no reassessment date found

Safeguards

FPIC confirmed; grievance mechanism present

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents