PUR removal United States Vintage 2024 Documentazione completa General Methodology v2.0

Restoration Fuels

PUR-371935 ↗

4.5 / 10
Integrity
5.2
Transparency
3.8
Claim Safety
4.2
Documentation
4.6

Score Breakdown

Integrity

verified The methodology document indicates additionality was confirmed by the VVB using an investment test.

missing Baseline is project-specific and key integrity controls (buffer pool, reversals, leakage deduction value) are not found in the extracted record.

Transparency

verified The methodology document date and version are provided (2024-02-01; 2022 V3).

missing Core MRV/registry fields (VVB name, monitoring period, claimed vs verified removals, usage monitoring method) are not found in the extracted record.

Claim Safety

verified Leakage is at least described as quantified in the methodology document.

missing CORSIA/CCP status and the project’s verified removal numbers are not found in the extracted record, increasing greenwashing/over-crediting uncertainty.

Documentation

verified Extraction confidence is high and no material findings or corrective actions are reported in the extracted record.

missing Evidence documentation is thin/unclear (only 2 documents used and evidence docs listed as "unknown").

Detailed Analysis

Integrity

The methodology document indicates additionality was assessed via an investment test and confirmed by the VVB, which supports additionality robustness. The baseline approach is project-specific, and the extracted record does not include when (or whether) the baseline was last reassessed, which weakens baseline credibility. Although leakage is described as quantified in the methodology document, the actual leakage deduction percentage is not found in the extracted record, and permanence controls (buffer pool percentage and any reversal events) are also not found.

Transparency

Transparency is limited because the extracted record lacks the monitoring period, any claimed or verified removal totals, and the VVB name, all of which are central to MRV traceability. The methodology version and document date are provided (2022 V3; 2024-02-01), but the evidence document list is not specific (listed as "unknown"), reducing auditability. With no claimed-versus-verified figures available, it is not possible to evaluate quantification accuracy from the extracted record.

Claim Safety

Claim safety is constrained by missing eligibility and quantification signals: CORSIA eligibility and CCP status are not found in the extracted record, so buyers cannot easily gauge alignment with higher-integrity labels. Over-crediting risk cannot be assessed because neither claimed nor verified removals are provided. Leakage treatment is directionally positive (described as quantified in the methodology document), but without the deduction value it is unclear how conservatively leakage was handled.

Documentation

Documentation quality is moderate: extraction confidence is high and the extracted record reports no material findings or corrective actions, which is a positive signal. However, only two documents were used and the evidence document identifiers are not specific ("unknown"), limiting traceability to official sources. Several key fields typically found in verification/monitoring reports (monitoring period, VVB name, verified totals) are not found in the extracted record.

Overall

No contradictions were listed in the extracted record, so there are no cross-document discrepancies to resolve. The main limitation is evidence gaps: the record supports that additionality was VVB-confirmed and safeguards elements are present, but it does not provide the quantitative MRV and permanence/leakage parameters needed to judge credit accuracy. As a result, scores are held in the mid-to-low range, with particular penalties to transparency and claim safety due to missing verified outcomes and eligibility information.

Audit Analysis

The extracted record indicates additionality was assessed using an investment test and confirmed by a VVB, and safeguards elements (FPIC and a grievance mechanism) are mentioned. However, key quantification and MRV fields (verified removals, monitoring period, leakage deduction value, permanence/buffer provisions, and methodology identification) are missing from the available extracted documents, limiting confidence in crediting accuracy.

Project Description

PUR-371935 — Biomass Removal

Red Flags

  • No verified or claimed removal totals were found in the extracted record, preventing an assessment of over-crediting risk.
  • Leakage is described as quantified, but the actual leakage deduction percentage is not provided in the extracted record.
  • Permanence risk management information (buffer pool and any reversal events) is not found in the extracted record.

Credit Vintages Exhausted

Issued Retired Available
2024
877 877 0
Total 877 877 0

Cosa migliorerebbe questo punteggio

  • Provide the verification/monitoring report(s) showing the monitoring period and the claimed vs verified removal totals, including any uncertainty/discounting applied.
  • Disclose permanence risk management details (buffer pool contribution, monitoring duration, and any reversal provisions/events) and the quantified leakage deduction percentage with calculation references.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Permanence controls not evidenced

Leakage

Quantified but deduction not shown

Baseline

Project-specific baseline; reassessment unclear

Safeguards

FPIC and grievance mechanism stated

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti