Audit Analysis
A CDM biomass fuel-switch project in Rajasthan with VVB-confirmed additionality, but the additionality case had to be restructured from an investment to a technological barrier during validation, and 15 material findings were raised. A significant discrepancy exists between two monitoring reports on total emission reductions (15,040 vs. 29,998 tCO₂e), and key parameters such as the verified ERR, FNRB, and buffer pool are not stated in the available record.
Red Flags
- Two monitoring reports give materially different total ERR figures: 15,040 tCO₂e (Feb 2012 report) vs. 29,998 tCO₂e (Feb 2011 report) — a near 2× discrepancy that is unexplained in the extracted record.
- The additionality justification was restructured from an investment barrier to a technological barrier during validation (CAR11–CAR13), indicating the original case was weak and required significant revision.
- Leakage is set at 0% and 'deemed negligible' with no quantified analysis or detailed justification in the available documents.
- No buffer pool percentage, reversal-event history, or baseline reassessment date is stated in any available document.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 13,106 | 0 | 13,106 | |
| 2011 | 15,111 | 0 | 15,111 | |
| 2012 | 45,054 | 0 | 45,054 | |
| Total | 73,271 | 0 | 73,271 |
Risk Indicators
VVB-confirmed but barrier restructured from investment to te
biomass-energy rever
0% deduction, 'deemed negligible' without quantified analysi
Project-specific baseline; no reassessment date stated
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →