Generation of electricity from bundled 25 MW wind energy project aggregated by Resurge Energy Private Limited
#1422of 1935 in Renewable energy#774of 975 in India#1161of 1459 in CDM (UNFCCC)#1093of 1287 in ACM0002
Audit Analysis
A 25 MW wind project in India validated under CDM with a jurisdictional baseline and VVB-confirmed combined additionality test, but the validation report recorded 20 material findings (all subsequently resolved) covering IRR errors, WTG specification mismatches, and methodology justification gaps. The extracted record contains no monitoring reports, a 10-fold discrepancy in total emissions reductions between the PDD and validation report, and low extraction confidence, leaving the project's actual performance largely unverified.
Red Flags
- Total ERR differs by a factor of 10 between the PDD (388,930 tCO2) and the validation report (38,893 tCO2), a material data-reliability issue
- 20 material findings at validation, including IRR input values lacking supporting evidence, WTG specifications not matching manufacturer data, and a crediting-period start date that preceded the registration date
- No monitoring reports are present in the extracted record, so actual emissions reductions over the 2011–2021 crediting period cannot be verified
- Low extraction confidence across the document set, with one document of unknown type
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional baseline, 2007 grid EF
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →