GEYCEK Wind Farm Project
GS-1792 ↗ · current registry ID: GS608
#177of 770 in Renewable energy#40of 121 in Turkey#88of 426 in Gold Standard (GS)#134of 383 in ACM0002
Audit Analysis
The Geycek Wind Farm is a fundamentally sound Gold Standard wind project with VVB-verified additionality, a jurisdictional baseline, and no reversal events. However, a large volume of corrective actions (17 CARs, 6 CRs), a capacity increase from 150 to 168 MW not fully reflected in the registered PDD, metering deviations, and low extraction confidence in the source documents introduce meaningful data-reliability concerns that temper an otherwise clean profile.
Red Flags
- Capacity increased from 150 MW to 168 MW via software application, yet the registered PDD still reflects the original configuration — the VVB flagged this as a corrective action, raising questions about whether the ex-ante ERR estimate was recalculated.
- Monitoring used 2 main electricity meters instead of the 1 specified in the registered PDD, a deviation from the approved methodology that was only resolved through corrective actions.
- 17 Corrective Action Requests and 6 Clarification Requests were issued and closed across verification cycles, including missing 2020 EPİAŞ/TEİAŞ grid data and missing 07–08 months of 2023 generation data, indicating recurring gaps in the project's record-keeping.
- Minimum extraction confidence across the 25 source documents is rated low, meaning at least one key document was poorly readable and the structured data may under-represent the full evidentiary record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 139,601 | 139,601 | 0 | |
| 2017 | 204,452 | 204,452 | 0 | |
| 2018 | 216,577 | 216,465 | 112 | |
| 2019 | 218,251 | 204,976 | 13,275 | |
| 2020 | 228,112 | 166,099 | 62,013 | |
| 2021 | 243,548 | 0 | 243,548 | |
| 2022 | 230,174 | 0 | 230,174 | |
| 2023 | 135,454 | 0 | 135,454 | |
| Total | 1,616,169 | 931,593 | 684,576 |
Risk Indicators
VVB-confirmed combined test
Wind avoidance – no reversal risk
0% – negligible for grid-connected wind
Jurisdictional but EF from 2018; earlier docs said project-s
Grievance mechanism present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →