UCRAndhra Pradesh IndiaACM0002

Grid Connected Wind Energy Generation at Andhra Pradesh

UCR-507 ↗

#1667of 1935 in Renewable energy#82of 433 in Universal Carbon Registry (UCR)#1239of 1287 in ACM0002

3.5/ 10
Integrity
3.5
Transparency
2.0
Claim Safety
5.5
Documentation
2.5

Audit Analysis

A grid-connected wind energy project in Andhra Pradesh using a jurisdictional baseline and a 0% leakage deduction (deemed negligible), which are both appropriate for the sector. However, the evidence base is extremely thin: only a single PDD is available, no verification or monitoring reports exist, no VVB is identified, and no additionality test is documented. The project cannot be meaningfully assessed for over- or under-delivery because no verified ERR figure is available to compare against the 24,255 tCO₂e claimed.

Red Flags

  • No additionality test type or VVB verification of additionality is documented in any available record
  • No verification report or monitoring report is present; the 24,255 tCO₂e claimed ERR cannot be cross-checked against a verified figure
  • No VVB (Verification and Validation Body) is identified in the extracted record
  • Only a single PDD (dated 2025-03-03) constitutes the entire evidence base

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test documented

Permanence

Avoidance project – no inherent reversal risk

Leakage

0% deemed negligible – appropriate for wind

Baseline

Jurisdictional but no reassessment date

Safeguards

Mentioned but FPIC and grievance not confirmed

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents