Denizli Wind Power Project, Turkey

VCS-1908 ↗

#35of 770 in Renewable energy#10of 121 in Turkey#45of 629 in Verra (VCS)#25of 383 in ACM0002

6.7/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
6.0

Audit Analysis

The Denizli Wind Power Project is a well-structured VCS renewable energy project with VVB-confirmed additionality, no reversal events, and a reasonable leakage treatment. However, a contradiction between the verification report and monitoring report on baseline methodology (project-specific vs. jurisdictional), combined with medium extraction confidence and multiple cross-document discrepancies, moderate the overall confidence in the project's data integrity.

Red Flags

  • Baseline method contradiction: the 2025 verification report states a project-specific baseline while the 2025 monitoring report references a jurisdictional baseline — the more conservative interpretation is unclear
  • Crediting period discrepancy: the PDD (2018) lists 2019-01-01 to 2028-12-31 while the 2025 verification report states 2019-09-13 to 2029-09-12, suggesting an unexplained adjustment
  • Grid emission factor dated to 2017 with no evidence of update in the 2024 monitoring period

Credit Vintages

IssuedRetiredAvailable
2019
23,027023,027
2020
93,87282993,043
2021
128,6500128,650
2022
113,2940113,294
2023
110,5450110,545
2024
103,6390103,639
Total573,027829572,198

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversals

Leakage

0% with negligible justification

Baseline

Project-specific, method contradiction

Safeguards

Present per 2025, absent in 2024

Double-claim

CORSIA excluded, CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents