Denizli Wind Power Project, Turkey
#35of 770 in Renewable energy#10of 121 in Turkey#45of 629 in Verra (VCS)#25of 383 in ACM0002
Audit Analysis
The Denizli Wind Power Project is a well-structured VCS renewable energy project with VVB-confirmed additionality, no reversal events, and a reasonable leakage treatment. However, a contradiction between the verification report and monitoring report on baseline methodology (project-specific vs. jurisdictional), combined with medium extraction confidence and multiple cross-document discrepancies, moderate the overall confidence in the project's data integrity.
Red Flags
- Baseline method contradiction: the 2025 verification report states a project-specific baseline while the 2025 monitoring report references a jurisdictional baseline — the more conservative interpretation is unclear
- Crediting period discrepancy: the PDD (2018) lists 2019-01-01 to 2028-12-31 while the 2025 verification report states 2019-09-13 to 2029-09-12, suggesting an unexplained adjustment
- Grid emission factor dated to 2017 with no evidence of update in the 2024 monitoring period
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 23,027 | 0 | 23,027 | |
| 2020 | 93,872 | 829 | 93,043 | |
| 2021 | 128,650 | 0 | 128,650 | |
| 2022 | 113,294 | 0 | 113,294 | |
| 2023 | 110,545 | 0 | 110,545 | |
| 2024 | 103,639 | 0 | 103,639 | |
| Total | 573,027 | 829 | 572,198 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
0% with negligible justification
Project-specific, method contradiction
Present per 2025, absent in 2024
CORSIA excluded, CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →