Skip to main content
VCSLivestock, enteric fermentation, and manure management; Waste handling and disposalChina Registry: RegisteredAMS-III.F

Guangxi Baiduoshou Composting Project

VCS-4487 ↗

#11of 202 in Industrial#43of 204 in China#142of 629 in Verra (VCS)#4of 12 in AMS-III.F

6.1/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
5.5
Documentation
6.5

Audit Analysis

The Guangxi Baiduoshou Composting Project is a VCS AMS-III.F manure management project with a VVB-confirmed investment additionality test and an avoidance-based design that carries minimal permanence risk. However, the project-specific modeled baseline, a 0% leakage deduction with contradictory justifications across documents, and a significant discrepancy between the original PDD lifetime estimate (570,160 tCO₂e) and the monitoring-period verified figure (77,393 tCO₂e) introduce moderate uncertainty. The project delivered roughly 74% of the pro-rata expectation for the elapsed monitoring period, which is conservative and reduces over-crediting risk.

Red Flags

  • The original PDD (Aug 2023) states a lifetime ERR of 570,160 tCO₂e while the updated PDD (Nov 2025) and verification report both cite 77,393 tCO₂e — a 7.4× discrepancy that, while likely reflecting different time bases (full 10-year crediting period vs. ~22-month monitoring period), signals a lack of clarity in how the ex-ante estimate was revised.
  • Leakage justification is inconsistent: the monitoring report (Jan 2025) describes it as 'quantified' while the validation report (Jan 2025) describes it as 'deemed negligible,' and the deduction is 0% in both cases.
  • Buffer pool percentage is not stated in any available document, leaving the permanence safeguard mechanism unquantified despite the project being an avoidance-type activity.
  • Benefit-sharing description is contradictory: the validation report (Jan 2025) states it is not described, while the PDD (Nov 2025) states it is described.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification inconsistent across docs

Baseline

Project-specific modeled, no reassessment date

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS-III.F

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents